Category:East Side Access construction/2019/10/25
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/10/25"
The following 25 files are in this category, out of 25 total.
-
Connecting conduits through manholes in Harold Interlocking. 10-17-2019 (48959361966).jpg 3,024 × 4,032; 2.85 MB
-
Elevator frame installation in the future LIRR Terminal. 10-16-2019 (48959362196).jpg 4,032 × 3,024; 3.9 MB
-
Installation of track monuments in the Manhattan Tunnels. 10-23-2019 (48959362001).jpg 4,608 × 3,456; 6.01 MB
-
Installing wall tile mockups in the future LIRR Terminal. 10-18-2019 (48959548227).jpg 4,032 × 3,024; 2.48 MB
-
Sanding down sheetrock finishes in the future LIRR Concourse. 10-24-2019 (48958809143).jpg 2,448 × 3,264; 1.72 MB